You are here

CAD Boiler Panel High Capacity 4 Pump

Stk#: 
CAD02
Short Description: 
CAD BOILER PANEL HI CAP
Short Description 2: 
4 PUMP
Status: 
Active
Date Introduced: 
July 1, 2014

This panel works with Lochinvar Cadet boilers.
The panel has four Grundfos UPS15-58 pumps. There is a primary pump, a DHW pump and two heating pumps. The primary and DHW pumps are controlled by the boiler. The heating pump is controlled by a thermostat (supplied separately) wired to the terminal strip on the panel. The water temperature is controlled by the boiler.

Thumbnail Stk# Title Publication Date Size Download
Look Whats New, Brochure
L5820 CAD Boiler Panels Cutsheet 2016-05-13 803.55 KB Download
Instructions
L6CAD0X CAD Boiler Panel Instructions 2021-10-01 7.34 MB Download
Submittal
SUBCAD00 CAD Boiler Panel Submittal 2021-09-24 1.27 MB Download

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer